Comparing client projects in the workspace
If you manage many projects, for example one per client, the workspace Projects page has a Performance view that puts them in one table. Each row is one project with its latest scores, how they moved, its failed checks and its open actions. Use it to see which projects moved this month and which need attention first, then open a project for the detail.
Quick orientation
- The Performance view sits on the workspace Projects page, beside the Setup view. The Setup view lists the same projects, in the same order and with the same search and filters, with configuration columns instead, such as domains, brands, check frequency, prompts, URLs, briefs and pieces.
- Choose a 30 days or 90 days period at the top. The page opens on 30 days.
- Click a column header to sort. Click again to reverse it.
- Search by name, filter by country, check frequency or engine, and use the status chips: Down, Up, Failed checks, Critical actions, Below own Fair target and Never checked. The table shows 50 projects at a time, with Previous and Next below it.
- Export downloads the table as CSV or Excel, if you can edit at least one of the projects.
- Each project is measured on its own. The table is a set of separate readings, not a league table.
What you see
You only see the projects you have access to. Owners and Admins see every project in the workspace. A User or Guest sees the projects they were given access to, and a Guest cannot export.
Each row shows:
- Project - the name, with its country and language.
- AI Success Score, Citations Rate, Mentions Rate and Sentiment Score - the project's latest values. They are the same numbers as on that project's Overview, computed the same way. A Sentiment Score that no engine produced reads "No data", never 0.
- Change - how the AI Success Score moved over the period you chose, with an arrow and words for screen readers. The other three metrics show their own change beneath the value.
- Trend - a small line of the AI Success Score over the period.
- Failed checks - how many checks failed in the period, linking to the project's failed-check details. A project with none shows nothing here.
- Actions - open Action Center items for the project, with the number that are critical.
- Engines - the engines that answered in the latest check.
- Cadence and Last check - how often the project is checked, and the date of the latest check.
A project with no answered check reads "Not checked yet" and sorts last. Clicking a row opens the project's Overview.
The summary strip above the table counts projects with a score, shows failed checks as a plain count, names the project with the Largest drop this period and totals open actions. It shows no average or combined score across projects, because projects are not measured on the same basis.
How change is measured
The Change column compares the project's latest check with the first check in the selected range, the same basis the Overview uses for its change figures. The cell shows the date it starts from, and its tooltip and screen-reader text name that basis, for example "down 4.2 points since the first check in the selected range, on 2 Oct". The tooltip also shows the change against the previous check.
- A project with only one check in the range shows "One check in this period" instead of a change. A project whose latest check is older than the range shows "No check in this period".
- A small marker appears when the set of engines differs between the two checks. Part of that change may come from the engine set rather than from your visibility.
- Changes are drawn in a neutral colour. The table does not call a change good, bad or significant, and a movement shown here can still be ordinary variation between checks. The project's own Overview is where to judge it.
- Up and Down chips use a fixed band of 1 point, so a project that moved less than that counts as flat.
Read it as separate readings
Each project is measured on its own prompts, engines, country, check frequency and score targets. Compare a project with its own past, not with other projects. The table sorts by any column, but a sort order is not a ranking, and ziptie.ai does not rank clients, compare them with an industry or a market average, or combine their scores.
Colours and the Below own Fair target chip use each project's own targets, set in its Project Settings under Performance Thresholds. A project with no targets of its own uses the default targets. Two projects with the same score can therefore show different colours. The export records which targets applied to each row.
Failed checks
Failed checks are left out of every rate and score, the same as on a project's own pages. The Failed checks column counts them for the period and shows "Not computed" where the project has no failed-check record for it. A project whose newest check failed completely still shows its latest answered check, with a note that a newer check failed.
Exporting the table
Choose Export, then Download CSV or Download Excel. The CSV download is a zip with one file per sheet. The menu appears when at least one project in the table is one you can edit.
- The file has one row per project you can edit, in name order, and ignores the search and filters on screen. It carries no totals, averages or summary row.
- Owners and Admins export every project. A User exports the projects where they are an editor. If some projects are left out because you cannot edit them, the file's Provenance sheet says how many.
- A viewer-only member and a Guest cannot export.
- The file holds the current, previous and period-start readings with their dates, both changes per metric, failed-check counts, actions, engines, cadence and which targets applied. It is not branded.
- It is a one-off download. It is not stored in an export history and has no share link. For something to send to a client, use a client report, which is made for one project at a time.
Very large workspaces show the first 500 projects by name, with a notice, and the export carries the same note. Search and filters narrow what you see on screen. If a read or an export is refused because you sent too many requests in a short time, the page shows "Too many requests. Wait a minute, then try again."
What it does not do
- It does not merge several projects into one. A project covers one country and domain, so each market is its own project here.
- It does not email or schedule the table. Scheduling covers client reports only.
- It is available through the public API and MCP to a workspace token only: a project token cannot read it. The API read returns the same rows and the same comparison note, and it is not a benchmark across projects either.